Timber formwork costs less upfront, but an engineered system usually works out cheaper per square metre poured once you add labour, waste, timber replacement and days on programme. The gap widens with every additional floor.
Side by side
| Criterion | Traditional timber / Engineered system |
| Assembly output | Depends on skilled carpenters / INDE-K benchmark: 400 m² of slab per day with 8 people |
| Reuses | Few before replacement / Long-service panels and props; high-turnover three-ply panels |
| Waste on site | High (offcuts, nails, damaged timber) / Low: modular pieces, no cutting |
| Concrete finish | Varies between uses / Consistent pour after pour |
| Labour | Intensive, and increasingly scarce / Smaller crews, trainable in a few days |
| Planning | Worked out on site / Floor-by-floor layout drawings in AutoCAD before delivery |
| Safety | Depends on how well it is built by hand / Components with certified load capacity |
| Investment | Buying timber / Renting for the duration of the structure |
When timber still makes sense
On very small projects, one-off elements or geometry that never repeats, timber and plywood remain a sound choice. Plenty of projects use both: an engineered system for the typical slabs and plywood for edges and special shapes.
When an engineered system pays off
- Multi-storey buildings with repeating floor plates.
- Hotels and residential schemes with several identical blocks.
- Projects on tight programmes, or where carpenters are hard to find.
- Work that demands a uniform concrete finish.
How to compare using your own numbers
Ask for the system's cost per m² per month and set it against what you currently spend on timber, nails, carpentry labour and cycle days per floor. INDE-K prepares that technical study free of charge from your drawings. Request it here.
What people ask us most
Which is better, metal or timber formwork?
On projects with repeating floors an engineered system is usually faster and cheaper per m² poured. Timber still makes sense on small jobs or shapes that do not repeat.
How many square metres of slab can be assembled per day with an engineered system?
With the INDE-K system and a trained crew of eight, the benchmark output is 400 m² per day.
Have a project coming up?
Send us the slab area per level, the location and the start date. We reply within 12 business hours and send a tailored quote in 1 to 3 business days.