Metal vs. timber formwork

What changes in time, cost and quality when a project moves from traditional formwork to an engineered system.

Timber formwork costs less upfront, but an engineered system usually works out cheaper per square metre poured once you add labour, waste, timber replacement and days on programme. The gap widens with every additional floor.

Side by side

CriterionTraditional timber / Engineered system
Assembly outputDepends on skilled carpenters / INDE-K benchmark: 400 m² of slab per day with 8 people
ReusesFew before replacement / Long-service panels and props; high-turnover three-ply panels
Waste on siteHigh (offcuts, nails, damaged timber) / Low: modular pieces, no cutting
Concrete finishVaries between uses / Consistent pour after pour
LabourIntensive, and increasingly scarce / Smaller crews, trainable in a few days
PlanningWorked out on site / Floor-by-floor layout drawings in AutoCAD before delivery
SafetyDepends on how well it is built by hand / Components with certified load capacity
InvestmentBuying timber / Renting for the duration of the structure

When timber still makes sense

On very small projects, one-off elements or geometry that never repeats, timber and plywood remain a sound choice. Plenty of projects use both: an engineered system for the typical slabs and plywood for edges and special shapes.

When an engineered system pays off

  • Multi-storey buildings with repeating floor plates.
  • Hotels and residential schemes with several identical blocks.
  • Projects on tight programmes, or where carpenters are hard to find.
  • Work that demands a uniform concrete finish.

How to compare using your own numbers

Ask for the system's cost per m² per month and set it against what you currently spend on timber, nails, carpentry labour and cycle days per floor. INDE-K prepares that technical study free of charge from your drawings. Request it here.

FAQ

What people ask us most

Which is better, metal or timber formwork?

On projects with repeating floors an engineered system is usually faster and cheaper per m² poured. Timber still makes sense on small jobs or shapes that do not repeat.

How many square metres of slab can be assembled per day with an engineered system?

With the INDE-K system and a trained crew of eight, the benchmark output is 400 m² per day.