Boulevard 1ro de Noviembre #15, Local 401, Punta Cana Village We reply within 12 working hours
ES EN
Home › Slab formwork

Slab formwork

Shoring, beams, props and three-ply panels for solid and ribbed slabs. Rental and sale across the Dominican Republic.

Flagship system

Short cycles, crews that perform

The INDE-K slab system is built around one simple idea: fewer parts and less handling per square metre. On site that shows up as one concrete number: 400 m² assembled in a day with an eight-person crew.

It works for both solid and ribbed slabs, and relies on the 27 mm three-ply panel, which takes far more uses than conventional plywood and leaves an even finish pour after pour.

  • Solid and ribbed slabs on the same base system
  • Drop-beam striking so panels come down early while safety props stay in place
  • 27 mm three-ply panel built for high rotation
  • Props, joists and accessories from the same supplier
  • Layout drawings per level delivered before the first shipment
INDE-K slab formwork seen from below, with beams and props

Shall we quote your project?

Send us the area and location. We return the material take-off and the cost per m² per month.

Request a quote Chat on WhatsApp
We reply within 12 working hours
At a glance

System data

Assembly rateUp to 400 m² per day with an 8-person crew
ApplicationSolid and ribbed slabs, high-rise and civil works
Panel27 mm three-ply (18 mm phenolic plywood also available)
Local inventory10,000 m² available at the Verón yard
Available asRental per piece per day, or purchase
Delivery2 to 5 business days from confirmed order

Full technical data sheets and load certificates are provided with every quote.

FAQ

What we get asked most

How many square metres of slab can I assemble per day?

With the INDE-K system and a trained eight-person crew, the benchmark is 400 m² per day. The real figure depends on slab geometry, floor-to-floor height and crew experience, and we refine it in the technical study for your project.

How much material do I need?

It depends on the slab area per level and the pour cycle you want to sustain. Most clients rent material for one or two levels and rotate it. Send us drawings or the area per level and we return the calculation with the quote.

Does the rental include assembly labour?

No. We supply the system, the layout drawings, training for your crew and technical support at the first pour. Assembly is carried out by the site crew.

What is the minimum rental period?

Thirty days. From there we bill per piece per day, and the technical study gives you the equivalent cost per m² per month so you can budget it.

Have a project coming up?

Send us the slab area, the location and the start date. We return a tailored quote in 1 to 3 business days depending on complexity.

✓ Reply within 12 working hours ✓ Technical study included ✓ No commitment
Get a quote WhatsApp