Phenolic plywood in 12, 15, 18 and 27 mm and 27 mm three-ply panels. Direct sale, no minimum, delivered in 2 to 5 business days.
Phenolic plywood and three-ply panels
We sell phenolic formwork plywood in four thicknesses and 27 mm three-ply panels for slab systems. This is a direct sale: no rental minimum attached, no contract required.
It is the material that turns over most on a site and the one most often underestimated at budget stage. A panel that takes more uses changes the real cost per square metre poured, not just the invoice price.
- Phenolic plywood in 12, 15, 18 and 27 mm
- 27 mm three-ply panel for slab systems
- No minimum order and no rental contract attached
- Delivered in 2 to 5 business days across the Dominican Republic
- Guidance on the right thickness for your system and finish
Shall we quote your project?
Send us the area and location. We return the material take-off and the cost per m² per month.
Request a quote Chat on WhatsAppSystem data
| Phenolic plywood 12 mm | Light formwork, linings and site carpentry |
| Phenolic plywood 15 mm | General-purpose wall and column formwork |
| Phenolic plywood 18 mm | Wall, column and slab where finish matters |
| Phenolic plywood 27 mm | High-load, high-rotation applications |
| Three-ply panel 27 mm | INDE-K slab formwork system |
| Delivery | 2 to 5 business days from confirmed order |
Full technical data sheets and load certificates are provided with every quote.
What we get asked most
Which thickness do I need?
It depends on the system, the pour pressure and the finish the project requires. As a rule of thumb, 15 mm and 18 mm cover most wall and column formwork, and the 27 mm three-ply is what we use in the slab system. Tell us the application and we will tell you what to order.
Is there a minimum order?
No. You can buy anything from a small batch to replace worn panels up to the full supply for a project.
Do you sell to site carpenters, not just contractors?
Yes. A good share of our panel sales goes to site carpenters and structural subcontractors working with their own material.
How long does delivery take?
Two to five business days from confirmed order. Transport is initially at the client's cost; depending on volume and the type of business we review whether to include it.
Other systems
Swipe to see all systems
Slab formwork
Our flagship system. Beams, props and three-ply panels for solid and ribbed slabs. Up to 400 m² assembled per day with an 8-person crew.
View systemWall formwork
Vertical metal panels for walls, retaining walls and cores. Hand-set or crane-set depending on panel weight and site equipment.
View systemColumn formwork
Square and adjustable molds for building and civil-works columns, with fair-faced concrete finish when the project calls for it.
View systemScaffolding and shoring towers
Façade scaffolding, shoring towers and props. All the vertical support on site from a single supplier.
View systemHave a project coming up?
Send us the slab area, the location and the start date. We return a tailored quote in 1 to 3 business days depending on complexity.